Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Info

For standalone users, those with goPost, or those with integrations that require EPR Intake, staff can either create assignments manually on the project Intake tab or use Automated Distribution workflows (if configured).

...

Warning

Integrated clients using EPR in conjunction with a partner permitting system should create assignments through their designated process rather using Intake unless instructed to.

Table of Contents
defaultclass
maxLevel6
minLevel1maxLevel6
include
outlinefalse
indentstyle
exclude.*Related articles.*
styledefault
typelist
printablefalse
class

...

The Intake Tab

Whenever documents require intake, the e-PlanREVIEW® (EPR) Intake tab displays a number that corresponds the number of files that need assignments. Incoming documents are listed separately, with each one then listing its own possible assignments. If there is more than one file, the first displays an expanded ‘assignments view’ while the rest remain collapsed until clicked.

...

Feature

Icon

Description

Prior Submittals

N/A

For resubmittals only. Dropdown that lists all first submittal documents within this project.

  • Resubmittals (documents listed as new versions of existing documents) will reference the prior document filename (or its document display name, if different) to which they are linked in this field.

  • If no filename is listed, the incoming file will be treated as a new first submittal file unless staff manually select a prior version document from the dropdown before creating assignments.

Info

See Prior Submittals [LINK] section for more details.

Group

N/A

Required. Each assignment must belong to a group so that one or more members of that group can view and work on the assignment as needed.

Review Type

N/A

Optional. If staff need to create multiple assignments for a single group, they can use this field to create unique sub-assignments. The options for this field populate from a list configured by the Admin.

Assignee

N/A

Optional. Staff can further designate a specific assignee (from a list of group members) to perform a plan review. Other group members will still have access and can work on the assignment, but the assignee is the designated reviewer.

Due Date (Assignment-level)

(blue star)

Recommended. Click on the calendar-shaped icon next to each assignment to set a Due Date.

Info

If multiple assignments are required, make sure each assignment has a Due Date set.

Due Date (Document-level)

(blue star)

Optional. If a document has multiple assignments and they all require the same Due Date, click on the calendar-shaped icon in-line with the document name to set a Due Date for all the document’s assignments at once.

Add Assignment

Click to add another row for an additional assignment below the existing assignment row.

Remove Assignment

Click to remove the current assignment row (removed assignments will not be created).

CREATE ASSIGNMENTS (Document-level)

Create Assignments Button-20240104-183211.png

Click to confirm and create all assignments for the current document.

RESET

Reset-20240104-183151.png

Click to clear all filled-out assignment information for the current document.

Delete (Document-level)

(blue star)

Click to delete an incoming document directly from Intake (users with delete rights only).

Note

Deleting is only recommend in specific circumstances [LINK to Delete section] because doing so will either prevent assignment(s) from being created for a new document or prevent existing assignments from updating when a resubmittal comes in.

...

Feature

Icon

Description

CREATE ASSIGNMENTS (Multi-document)

Create Assignments Button-20240104-183211.png

  1. Select multiple documents.

  2. Click to open the Batch Edit and Create Assignments [LINK to section] window.

    image-20240306-011246.png
Note

This window does not apply to resubmitted files. It does not allow you to override (change) or update existing assignments for a document. (Changes can be made from the project’s ASSIGNMENTS tab, after intake is completed.) [ADD LINK HERE]

Warning

Trying to replace existing assignments' information with a different Group, Review Type, Assignee, or even change an existing Due Date during a resubmittal will be ignored. (For resubmitted files, use the document-level assignments view instead.)

Due Date (Multi-document)

(blue star)

  1. Select multiple documents.

  2. Click to set the same Due Date for every assignment across all select documents.

Info

Assignment Due Dates can be confirmed or edited by deselecting all documents and then clicking on expand ( (blue star) )for any document.

Delete (Multi-document)

(blue star)

  1. Select multiple documents.

  2. Click to delete all selected documents without creating or updating assignments.

  3. Unlike with the document-level delete, this action requires confirmation before all selected files are deleted.

Note

This action cannot be undone except by submitting a Service Desk ticket to e-PlanSoft Support.

...

  1. Expand each document in the list to review the suggested assignments.

  2. Add Due Dates and/or otherwise modify suggested assignments, if necessary (refer to Assignment View [LINK] for details).

  3. Finish creating the assignment(s) by clicking CREATE ASSIGNMENTS or clear assignment suggestion(s) by clicking RESET.

...

Warning

Group cannot be changed for existing assignments. Review Type, Assignee, and the number of assignments cannot be changed during resubmittal intake, but can be updated afterward from the project’s ASSIGNMENTS tab. [LINK]

...

Deleting a Document from Intake

...

Filter by label (Content by label)
page
showLabelsfalse
max5
spacescom.atlassian.confluence.content.render.xhtml.model.resource.identifiers.SpaceResourceIdentifier@10c5c
showSpacefalse
sortmodified
typepage
reversetruetype
labelsupload intake project coordinator
cqllabel in ( "upload" , "intake" , "project" , "coordinator" ) and type = "page" and space = "EKB"labelsupload intake project coordinator